our major projects
SRB Port,Phase I
Engineering, Procurement and Construction of 1st phase of SRB Port Complex Development. Dredging and Land Reclamation with Total Volume about 13,500,000 m3 in one Phase. Construction of Nine Posts of container quay wall with 1000 m total length and -17 CD draft including Drilling, Reinforcement and Concreting of insitu T-shape section Panels.
SBC Port,Phase I
Engineering, Procurement and Construction of 1st phase of SBC Port Complex Development including: Extension of existing rubble mound breakwater by 1470m in -13.5 CD mean seabed depth with up to 25 ton weight rock materials.
Pars Service port
Engineering, Procurement and Construction of Pars Service Port including:
Two arms of rubble mound breakwater with the length of 2,300m (western arm) and 1,000m (eastern arm), up to 23m water depth, armored by Antifer concrete blocks up to 18 ton weight.
Two posts of general cargo berths with 760m length including soldier and anchor piles.
Land reclamation and dynamic compaction of 7ha in area.
Administrative buildings, fire fighting, electromechanical and Port Equipment facilities, water and power supplying and lighting systems, etc
SRB Port,Phase II
Engineering, Procurement and Construction of 2nd phase of SRB Port Complex Development.
Dredging and Land Reclamation with Total Volume about 8,000,000 m3 in one Phase.
Construction of Nine Posts of container quay wall with 1010 m total length & -16.5 CD draft including Drilling, Reinforcement and Concreting of insitu T-shape section Panels.
Capital dredging project,Port and Maritime China
Dredging of 12,000,000 m3 material and discharge to 7 km distance.
Capital dredging project,Tianjin Port, binghai,China
Dredging and deepering of big Tianjin Port and binghai port around 10,000,000 m3 and discharge 8km.
Qeshm commercial port
Development of the jetty, port, warehouses and buildings up to about 44 hectares and expandable to 1,400 hectares for comprehensive project of great Kaveh Port. Volume of dredged material : 1,800,000 m3
Pars Petrochemical port
Engineering, Procurement and Construction of Pars Petrochemical Port including:
Two arms of rubble mound breakwater with the length of 2700m (western arm) and 1,100m (eastern arm), up to 35m water depth, armored by Antifer concrete blocks up to 18 ton weight. Fifteen posts of various types of wharf including LNG and LPG with appropriate dolphins and mono piles, Container and multipurpose berths.
The structural systems for these berths are pile and deck, concrete block quay walls with precast blocks 18 to 130 ton.
POGC LNG export port
Engineering, Procurement and Construction of LNG Port including:
Rubble mound breakwater with the length of 940m including X-bloc concrete armor up to about 12 ton weight.
Construction of 2,600 m dike for land reclamation.
Two posts of LNG and LPG jetties plus three posts of Ro-Ro and general cargo berths.
Dredging of about 870,000m3 materials up to -16m CD.
Intake and outfall system at a distance of 850 m from the shore in 20m water depth by pipeline with 100 inches diameter.
SPGS LPG export berths
The project includes the dredging of basin, reclamation of new land for construction sulfur berth, construction of two LPG berths and breakwater with 4,657m long.
SPGS reclamation project
The project involves reclamation of new land for the development new phases in south pars and extension of the existing breakwater.
Deylam Port
Deylam port Dredging including : 860000 m3 dredging with Construction of 3 dyke with the length of 2 km length. Procurement and Construction of 1,000 m Posts.
Pavement including with Concrete Blocks.
Charak port
Dredging of basin and access channel of Charak Port (500,000m3) and Construction of Dyke and reclamation.
POGC trenching project
Dredging of pipeline trench for water supply of pipeline and chamber suction. Volume of dredged material : 700,000 m3
Kish commercial port
Procurement and Construction of Kish Port Complex development including: Dredging and Reclamation about 700,000 m3.
Tonbak Port
The project includes the dredging of basin, reclamation of new land for construction sulfur berth, construction of two LPG berths and breakwater with 4,657m long.